Town of Red River Tenderfoor Area Waterline Replacement Rebid-Negotiations

Construction of approximately 12,100LF of 6, 8 and 14-inch C-900 PVC pipe, 560 LF of 6, 8 and 14″ directional drilled HDPE DR 11 HDPE, isolation valves, hydrants, meter coil pits, and other appurtenances, trench groundwater dewatering, rock excavation, lien fill encasement, asphalt patching, concrete curb and sidewalk replacement.

Read more

TUMCARI Hoover Tank

Furnishing and installing approx. 3,922lf 6″ hdpe, 165,000 gal. Welded steel tank, 3592lf of 12″ hdpe well

Read more

Ruidoso Riverside WL & Tank

Construction of approximately 5,800-feet of 6 to 12-inch C-900 distribution line, 130-feet of 12″ HDPE, a 22″ steel casing bore, appurtenances, pavement replacement to local streets, demolition of two existing tanks and construction of a new 750,000 gallon welded steel water tank, and other incidental work identified in two base bid schedules and two additive…

Read more

Los Lunas North WL River Crossing.

Construction of approximately 12,100 linear feet of 16-inch waterline and 2-inch fiber optic conduit between Los Lentes Road and New Mexico 47 (NM-47) including horizontal directional drilling under the Rio Grande. This work includes a new 16-inch waterline, all appurtenances, connections to the existing water system, and jack and bore crossings under multiple irrigation waterways…

Read more

Mescalero Apache Tribe Community Water Improvements

Two welded storage tanks 172,000 gallon & 288,000 gallong, one chlorination building, pumphouse, equipping three production water wells, Installation of 10,740LF of 6″ watreline fire hydrants, jack & bore, PRV’s electrical, telemetry radio controls and SCADA integration.

Read more

Village of Maxwell Water Storage Tank Replacement

Construction of approximately 12,100LF of 6, 8 and 14-inch C-900 PVC pipe, 560 LF of 6, 8 and 14″ directional drilled HDPE DR 11 HDPE, isolation valves, hydrants, meter coil pits, and other appurtenances, trench groundwater dewatering, rock excavation, lien fill encasement, asphalt patching, concrete curb and sidewalk replacement.

Read more

2015 Colonias Water Tank- Bayard

Excavation for new tank site approximately 130 CY, design and construct foundation for 125,000 gallon fresh water tank, construct125,000 gallon bolted steel tank, reprogram SCADA system, cathodic protection system and all appurtenances.

Read more